Skip to main content
IDEACONCEPT
IdeaConcept
Market

Solutions for museums and attractions

Immersive experiences and interactive installations for cultural spaces.

ExhibitionsImmersive routesOpenings

What we do differently for an exhibition

The install is permanent and we will not be there. Three choices make it self-sufficient.

01

Everything restarts by itself

Scheduled power-up and shutdown sequences, automatic recovery after an outage, and players that resume their content unaided. The acceptance test is to pull the plug and watch what comes back.

02

The install reports on itself

A status feed that warns the museum team before a visitor does. Knowing a projector is off that same morning is worth more than a short response window on a failure found three days later.

03

We choose equipment built to run

Devices designed for continuous duty, with consumables whose life is known and whose replacement is scheduled. A meeting-room projector on a six-month exhibition is a failure with a date on it.

What a permanent route needs

Browse the catalogue
Video

Devices rated for continuous duty and content that restarts by itself after an outage. Projection is installed out of reach of the public, and the image source hides in a technical room rather than under the plinth.

Audio

Sound zones that do not bleed from room to room: directional coverage, low levels, and sometimes audio limited to one position so it does not invade the next space. Nothing audible when the room is empty.

Lighting

Light serves the object and respects its conservation: measured levels, no ultraviolet, controlled heat. Sources stay invisible from the route, and levels are documented so they can be reset identically.

Structures

Whatever carries screens and panels has to hold six months without moving and come down without marking the walls. Cable routes are planned in the drawing, not added afterwards with tape.

Your exhibition

Tell us how many months it has to run. Everything else follows from that.